D   a   y       L   o   g
D   a   y       L   o   g
Sunday 11. marca 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -1 2 3 7 6 5.5 4
II EX   0.75     ms
IIIa MCh 2 6 4 1.25     -2.75
IIIb MCh PF       4 it. Wght   —
II–III M       4 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP        
X FA        
XI F        
XII NCh 51 13 20 7 2     -5
XIII PrN       0.25     ms
XIV NP 6 13 7 0.75     -6.25
XII–XIV N       14 3     NA
XV S2b 20 21 1 3 2.75 2 -2
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2       1 4 2.75 2 -3
XVI S3           1.5 3  
VII+VIII+XV PS       1 8 5.5 4 -7
VII+VIII+XV+XVI RS       1 8 5.5 4 -7
IX–XI FS         0 2.5 4  
  S       1 9.5 9.5 9.5 -8.5
XVIIa ECh1 5 it.     —
XVIIb ECh2 5.5     11
XVIIc TXT   na     ok
XVIId PRG   na     —
XVII ECh         1.5     1.5
XVIIIa EML1   na     —
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       10 7.75 6.75 6.25 -2.25
I SL 21 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -7 -5 -1
incl. DN, LT