D   a   y       L   o   g
D   a   y       L   o   g
Sunday 4. marca 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -0.75 7 7.75 7 6 5.5 -0.75
II EX   0.75     ms
IIIa MCh 53 7 8.5 1.5 1.25     -0.25
IIIb MCh PF       4 it. Wght   —
II–III M       1.5 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 24.25 27.5 3.25 4 2.75 2 -0.75
VIII S2a 51 8.5 15.25 2.5 1     1.5
IXa FD       0 2.5 4  
IXb FP        
X FA        
XI F        
XII NCh 52 10.5 15.5 1.5 2     0.5
XIII PrN       0.25     ms
XIV NP 53 9 15 3 0.75     -2.25
XII–XIV N       4.5 3     NA
XV S2b 15.5 23.5 8 3 2.75 2 5
XVI S3   1.5 3
VII S1       3.25 4 2.75 2 -0.75
VIII + XV S2       10.5 4 2.75 2 6.5
XVI S3           1.5 3  
VII+VIII+XV PS       13.75 8 5.5 4 5.75
VII+VIII+XV+XVI RS       13.75 8 5.5 4 5.75
IX–XI FS         0 2.5 4  
  S       13.75 9.5 9.5 9.5 4.25
XVIIa ECh1 23.5 24.25 0.75 5 it.     —
XVIIb ECh2 5.5     3.75
XVIIc TXT   na     ok
XVIId PRG   na     —
XVII ECh       0.75 1.5     0.75
XVIIIa EML1   na     —
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       10.75 7.75 6.75 6.25 -3
I SL 27.5 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -2 -5 1
9 11.75 13.5 15
11.75 15.25
LT, DN 10.5 13.5 2 great Movies-in-Bed Day