D   a   y       L   o   g
D   a   y       L   o   g
Saturday 10. februára 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 51 -1.5 14.75 10.75 7 6 5.5 -3.75
II EX   0.75     ms
IIIa MCh 1.25     ms
IIIb MCh PF       4 it. Wght   —
II–III M         2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a -0.75 4 4.75 1     3.75
IXa FD       0 2.5 4  
IXb FP        
X FA        
XI F        
XII NCh 14.75 20 5.25 2     -3.25
XIII PrN   20 20.25 0.25 0.25     ok
XIV NP   0.75     ms
XII–XIV N       5.5 3     NA
XV S2b 20.25 20.5 0.25 3 2.75 2 -2.75
XVI S3 4 6.75 2.75   1.5 3 0.25
VII S1         4 2.75 2 -2.75
VIII + XV S2       5 4 2.75 2 2.25
XVI S3       2.75   1.5 3 0.25
VII+VIII+XV PS       5 8 5.5 4 -0.5
VII+VIII+XV+XVI RS       7.75 8 5.5 4 -0.25
IX–XI FS         0 2.5 4  
  S       8 9.5 9.5 9.5 -1.5
XVIIa ECh1 5 it.     —
XVIIb ECh2 5.5     5.25
XVIIc TXT   na     ok
XVIId PRG   na     —
XVII ECh         1.5     1.5
XVIIIa EML1   na     —
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ok
XXI PrB       ms
I + XIV SLS       10.75 7.75 6.75 6.25 -3
I SL 20.5 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -5 -1 1
-0.75 4.75
Charade Day