D   a   y       L   o   g
D   a   y       L   o   g
Friday 2. februára 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -2.25 6.5 8.75 7 6 5.5 -1.75
II EX   0.75     ms
IIIa MCh 7.25 8 0.75 1.25     0.5
IIIb MCh PF       4 it. Wght   —
II–III M       0.75 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP 52 8 14 5 -1
X FA        
XI F        
XII NCh 51 14 21 7 2     -5
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       7 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       5 0 2.5 4 -1
  S       5 9.5 9.5 9.5 -4.5
XVIIa ECh1 5 it.     —
XVIIb ECh2 5.5     7.75
XVIIc TXT   na     ok
XVIId PRG   na     —
XVII ECh         1.5     1.5
XVIIIa EML1 6.5 7.25 0.75 na     —
XVIIIb EML2 53 11 22.25 2.25 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       3 1.25 2.25 2.75 -1.75
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       8.75 7.75 6.75 6.25 -1
I SL 22.25 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -2 -5 -1
DN  
11 12
12 21