D   a   y       L   o   g
Sunday 24. septembra 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -3.5 7.75 11.25 7 6 5.5 -4.25
II EX 9 9.75 0.75 0.75     ok
III MCh 47 7.75 11.25 2.75 1.25     -1.5
II–III M       3.5 2     -1.5
IV FL   0.25     —
V PrM       0.25     —
VI QU   0.5     —
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 11.25 11.5 0.25 1     -0.75
IX FP         2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 13 17.5 4.5 2     -2.5
XIII PrN       0.25     —
XIV NP 48 11.5 19 2 0.75     -1.25
XII–XIV N       6.5 3     NA
XV S2b 47 17.5 20.75 2.75 3 2.75 2 -0.25
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2       3 4 2.75 2 -1
XVI S3           1.5 3  
VII+VIII+XV PS       3 8 5.5 4 -5
VII+VIII+XV+XVI RS       3 8 5.5 4 -5
IX–XI FS           2.5 4  
  S       3 9.5 7 5.5 -6.5
XVIIa ECh1 5 it.     —
XVIIb ECh2 na     —
XVIIc TXT   na     —
XVIId PRG   na     —
XVII ECh         1.5     1.5
XVIIIa EML1   na     —
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       —
I + XIV SLS       13.25 7.75 6.75 6.25 -5.5
I SL 20.75 7 6 5.5
 
9 9.75 incl. LT 18.5 19 MCh 4 —
13 18.5 1st Part = F 8
-1