D   a   y       L   o   g
Saturday 16. septembra 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -2.5 8 10.5 7 6 5.5 -3.5
II EX   0.75     ms
III MCh 47 8 12 1.25 1.25     ok
II–III M       1.25 2     NA
IV FL   0.25     —
V PrM       0.25     —
VI QU   0.5     —
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP   9.5 11 1.5   2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 14.25 17.5 3.25 2     -1.25
XIII PrN       0.25     —
XIV NP 17.5 22 4.5 0.75     -3.75
XII–XIV N       7.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3 12 14.25 2.25   1.5 3 0.75
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       2.25   1.5 3 0.75
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       2.25 8 5.5 4 -3.25
IX–XI FS       1.5   2.5 4  
  S       3.75 9.5 7 5.5 -5.75
XVIIa ECh1 5 it.     —
XVIIb ECh2 na     —
XVIIc TXT   na     —
XVIId PRG   na     —
XVII ECh         1.5     1.5
XVIIIa EML1 8.25 9.5 1.25 na     —
XVIIIb EML2 22 23.75 1.75 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       3 1.25 2.25 2.75 -1.75
XX JR   0.25     ms
XXI PrB       —
I + XIV SLS       15 7.75 6.75 6.25 -7.25
I SL 23.75 7 6 5.5
 
8.25 11 MCh 4 —
4.5
-1