D   a   y       L   o   g
D   a   y       L   o   g
Friday 14. júla 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -2 8.25 10.25 7 6 5.5 -3.25
II EX   0.75     ms
III MCh 8.25 9 0.75 1.25     0.5
II–III M       0.75 2     NA
IV FL   0.25     —
V PrM       0.25     —
VI QU   0.5     —
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 47 9 21.75 5.75   2.5 4 -1.75
X FA         2.5 4  
XI F         2.5 4  
XII NCh 47 12.5 18.5 6 2     -4
XIII PrN       0.25     —
XIV NP 18.5 19.5 1 0.75     -0.25
XII–XIV N       7 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       5.75   2.5 4 -1.75
  S       5.75 9.5 7 5.5 -3.75
XVIIa ECh1 5 it.     —
XVIIb ECh2 na     —
XVIIc TXT   na     —
XVIId PRG   na     —
XVII ECh         1.5     1.5
XVIIIa EML1 21.75 22 0.25 na     —
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       0.25 1.25 2.25 2.75 1
XX JR   0.25     ms
XXI PrB       —
I + XIV SLS       11.25 7.75 6.75 6.25 -3.5
I SL 22 7 6 5.5
 
12.5 19.5 incl. DN, LT MCh 4 —
6.75
-1