D   a   y       L   o   g
Friday 9. júna 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 9 9 7 6 5.5 -2
II EX   0.75     ms
III MCh 9 9.75 0.75 1.25     0.5
II–III M       0.75 2     NA
IV FL   0.25     —
V PrM       0.25     —
VI QU   0.5     —
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP   9.75 12 2.25   2.5 4 -1.25
X FA         2.5 4  
XI F   15 18 3   2.5 4 -3
XII NCh 12 15 3 2     -1
XIII PrN       0.25     —
XIV NP   0.75     ms
XII–XIV N       3 3     NA
XV S2b 18 20.5 2.5 3 2.75 2 0.5
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       2.5 4 2.75 2 0.5
XVI S3           1.5 3  
VII+VIII+XV PS       2.5 8 5.5 4 -1.5
VII+VIII+XV+XVI RS       2.5 8 5.5 4 -1.5
IX–XI FS       5.25   2.5 4 -1.25
  S       4.75 9.5 7 5.5 -4.75
XVIIa ECh1 20.5 22 1.5 5 it.     —
XVIIb ECh2 na     ms
XVIIc TXT   na     —
XVIId PRG   na     —
XVII ECh       1.5 1.5      
XVIIIa EML1   na     —
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       —
I + XIV SLS       9 7.75 6.75 6.25 -1.25
I SL 22 7 6 5.5
 
MCh 4 —
5.25
-1