D   a   y       L   o   g
Friday 12. mája 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -0.25 5.75 6 7 6 5.5 1
II EX   0.75     ms
III MCh 5.75 6.5 0.75 1.25     0.5
II–III M       0.75 2     NA
IV FL   0.25     —
V PrM       0.25     —
VI QU   0.5     —
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP   6.5 8 1.5   2.5 4  
X FA   21.25 23.25 2   2.5 4  
XI F         2.5 4  
XII NCh 12.5 21.25 8.75 2     -6.75
XIII PrN       0.25     —
XIV NP   0.75     ms
XII–XIV N       8.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3 8 12.5 4.5   1.5 3 -1.5
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       4.5   1.5 3 -1.5
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       4.5 8 5.5 4 0.5
IX–XI FS       3.5   2.5 4  
  S       6 9.5 7 5.5 -3.5
XVIIa ECh1 5 it.     —
XVIIb ECh2 na     ok
XVIIc TXT   na     —
XVIId PRG   na     —
XVII ECh         1.5     1.5
XVIIIa EML1   na     —
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       —
I + XIV SLS       6 7.75 6.75 6.25 1.75
I SL 23.25 7 6 5.5
 
MCh 4 —
9.5
-1