D   a   y       L   o   g
Wednesday 10. mája 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -1.5 4.5 6 7 6 5.5 1
II EX   0.75     ms
III MCh 47 4.5 8.5 2.25 1.25     -1
II–III M       2.25 2     NA
IV FL   0.25     —
V PrM       0.25     —
VI QU   0.5     —
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 48 5.75 9.75 2.25   2.5 4 -0.25
X FA         2.5 4  
XI F 49 8.5 11 2   2.5 4  
XII NCh 13.25 21.5 8.25 2     -6.25
XIII PrN       0.25     —
XIV NP   0.75     ms
XII–XIV N       8.25 3     NA
XV S2b 11 11.5 0.5 3 2.75 2 -1.5
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       0.5 4 2.75 2 -1.5
XVI S3           1.5 3  
VII+VIII+XV PS       0.5 8 5.5 4 -3.5
VII+VIII+XV+XVI RS       0.5 8 5.5 4 -3.5
IX–XI FS       4.25   2.5 4 -0.25
  S       2.75 9.5 7 5.5 -6.75
XVIIa ECh1 5 it.     —
XVIIb ECh2 na     ms
XVIIc TXT   na     —
XVIId PRG   na     —
XVII ECh         1.5     1.5
XVIIIa EML1 11.5 13.25 1.75 na     —
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       1.75 1.25 2.25 2.75 -0.5
XX JR   0.25     ms
XXI PrB       —
I + XIV SLS       6 7.75 6.75 6.25 1.75
I SL 21.5 7 6 5.5
 
5.75 7.5 MCh 4 —
7.5 9.25 10.5
9.25 9.75 -1