D   a   y       L   o   g
Sunday 7. mája 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 10.25 10.25 7 6 5.5 -3.25
II EX   0.75     ms
III MCh 47 10.25 26.25 16 1.25     -14.75
II–III M       16 2     NA
IV FL   0.25     —
V PrM       0.25     —
VI QU   0.5     —
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 2     ms
XIII PrN       0.25     —
XIV NP   0.75     ms
XII–XIV N         3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2         4 2.75 2 -4
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -8
VII+VIII+XV+XVI RS         8 5.5 4 -8
IX–XI FS           2.5 4  
  S         9.5 7 5.5 -9.5
XVIIa ECh1 5 it.     —
XVIIb ECh2 na     ms
XVIIc TXT   na     —
XVIId PRG   na     —
XVII ECh         1.5     1.5
XVIIIa EML1   na     —
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       —
I + XIV SLS       10.25 7.75 6.75 6.25 -2.5
I SL 26.25 7 6 5.5
 
DN... MCh 4 —
16
-1