D   a   y       L   o   g
Saturday 22. apríla 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 0.25 5 4.75 7 6 5.5 2.25
II EX   0.75     ms
III MCh 47 5 9.5 1.75 1.25     -0.5
II–III M       1.75 2     NA
IV FL   0.25     —
V PrM       0.25     —
VI QU   0.5     —
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP   9.5 13 3.5   2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 13 19.5 6.5 2     -4.5
XIII PrN       0.25     —
XIV NP F 6.25 9 2.75 0.75     -2
XII–XIV N       9.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       3.5   2.5 4  
  S       3.5 9.5 7 5.5 -6
XVIIa ECh1 5 it.     —
XVIIb ECh2 na     ms
XVIIc TXT   na     —
XVIId PRG   na     —
XVII ECh         1.5     1.5
XVIIIa EML1   na     —
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       —
I + XIV SLS       7.5 7.75 6.75 6.25 0.25
I SL 19.5 7 6 5.5
 
6.25 9 MCh 4 —
8.25
-1