D   a   y       L   o   g
Thursday 16. marca 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 3.75 9.5 5.75 7 6 5.5 1.25
II EX   0.75     ms
III MCh 9.5 10 0.5 1.25     0.75
II–III M       0.5 2     NA
IV FL   0.25     —
V PrM       0.25     —
VI QU   0.5     —
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA   10.5 13.5 3   2.5 4  
XI F   16.5 18.25 1.75   2.5 4 -0.75
XII NCh 48 13.5 16.5 2.25 2     -0.25
XIII PrN       0.25     —
XIV NP 15.5 16 0.5 0.75     0.25
XII–XIV N       2.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3 49 18.25 22.25 2   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       2   1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       2 8 5.5 4 -6
IX–XI FS       4.75   2.5 4 -0.75
  S       2 9.5 7 5.5 -7.5
XVIIa ECh1 19.75 21 1.25 5 it.     —
XVIIb ECh2 na     ms
XVIIc TXT   na     —
XVIId PRG   na     —
XVII ECh       1.25 1.5     0.25
XVIIIa EML1 47 10 15.5 0.75 na     —
XVIIIb EML2 21 21.75 0.75 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       1.5 1.25 2.25 2.75 -0.25
XX JR   0.25     ms
XXI PrB       —
I + XIV SLS       6.25 7.75 6.75 6.25 1.5
I SL 22.25 7 6 5.5
 
10.5 15.25 MCh 4 -4
15.25 16 4
19.75 21.75 MobiPocket Day 1