D   a   y       L   o   g
Saturday 29. januára 2005
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 1.5 8.5 7 7 6 5.5 ok
II EX   0.75     ms
III MCh 47 8.5 9.25 0.75 1.25     0.5
II–III M       0.75 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 11.75 13 1.25 2     0.75
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       1.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3 48 9.25 21 10.5   1.5 3 -7.5
VII S1         4 2.75 2 -2.5
VIII + XV S2         4 2.75 2 -2.5
XVI S3       10.5   1.5 3 -7.5
VII+VIII+XV PS         8 5.5 4 -5
VII+VIII+XV+XVI RS       10.5 8 5.5 4 2.5
IX–XI FS           2.5 4  
  S       10.5 9.5 7 5.5 1
XVIIa ECh1 21 24.75 3.75 5 it.     -4
XVIIb ECh2 na     ms
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       3.75 1.5     -2.25
XVIIIa EML1   na     ok
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       7 7.75 6.75 6.25 0.75
I SL 24.75 7 6 5.5
 
DN, LT… MCh 4 -3
11.75 13
-25 -6 -1