D   a   y       L   o   g
Saturday 29. mája 2004
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -2.25 10.75 13 7 6 5.5 -6
II EX 47 10.75 14 3.25 0.75     -2.5
III MCh 14 15 1 1.25     0.25
II–III M       4.25 2     -2.25
IV FL 15 15.25 0.25 0.25     ok
V PrM   15.25 15.5 0.25 0.25     ok
VI QU 15.5 16 0.5 0.5     ok
IV–VI PS       1 1     ok
VII S1 4 2.75 2 ms
VIII S2a 1     ms
IX FP         2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 16 18.25 2.25 2     -0.25
XIII PrN   18.5 18.75 0.25 0.25     ok
XIV NP   0.75     ms
XII–XIV N       2.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2         4 2.75 2 -4
XVI S3           1.5 3  
VII+VIII+XV LS         8 5.5 4 -8
VII+VIII+XV+XVI RS         8 5.5 4 -8
IX–XI FS           2.5 4  
  S       1.25 9.5 7 5.5 -8.25
XVIIa ECh1 5 it.     -3
XVIIb ECh2 na     ms
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh         1.5     1.5
XVIIIa EML1 18.25 18.5 0.25 na     ok
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       0.25 1.25 2.25 2.75 1
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       13 7.75 6.75 6.25 -5.25
I SL 18.75 7 6 5.5
 
*heavily* mingled with MCh MCh 4
-1 -1 -1