D   a   y       L   o   g
Tuesday 27. januára 2004
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 0.5 6 5.5 7 6 5.5 1.5
II EX   0.75     ms
III MCh 6 8.5 2.5 1.25     -1.25
II–III M       2.5 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI PS         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1     ms
IX FP         2.5 4  
X FA         2.5 4  
XI F 47 8.5 17.5 5.5   2.5 4 -1.5
XII NCh 48 11.5 16.5 3.5 2     -1.5
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       3.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV LS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       5.5   2.5 4 -1.5
  S         9.5 7 5.5 -9.5
XVIIa ECh1 49 17.5 26 8.5 na    
XVIIb ECh2 na    
XVIIc TXT   na      
XVIId PRG   na      
XVII ECh       8.5 1.5     -7
XVIIIa EML1   na     ok
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out         1.25 2.25 2.75 NA
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       5.5 7.75 6.75 6.25 2.25
I SL 26 7 6 5.5
 
11.5 12.5 14 16.5
12.5 14 7
visits of both Sharks, tpd, datart etc.etc. 1