D   a   y       L   o   g
Friday 28. januára 2005
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -2 7 9 7 6 5.5 -2
II EX   0.75     ms
III MCh 7 8.25 1.25 1.25     ok
II–III M       1.25 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 12 13 1 2     1
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       1 3     NA
XV S2b 3 2.75 2 ms
XVI S3 47 8.25 20.25 11   1.5 3 -8
VII S1         4 2.75 2 -2.5
VIII + XV S2         4 2.75 2 -2.5
XVI S3       11   1.5 3 -8
VII+VIII+XV PS         8 5.5 4 -5
VII+VIII+XV+XVI RS       11 8 5.5 4 3
IX–XI FS           2.5 4  
  S       11 9.5 7 5.5 1.5
XVIIa ECh1 20.25 25.5 5.25 5 it.     -4
XVIIb ECh2 na     ms
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       5.25 1.5     -3.75
XVIIIa EML1   na     ok
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       9 7.75 6.75 6.25 -1.25
I SL 25.5 7 6 5.5
 
12 13 MCh 4 -3
-24 -5 -1