D   a   y       L   o   g
Friday 20. augusta 2004
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -1.5 5 6.5 7 6 5.5 0.5
II EX   0.75     ms
III MCh 48 5 14 5.25 1.25     -4
II–III M       5.25 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 49 5.25 9.5 3.75   2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 14 15.75 1.75 2     0.25
XIII PrN   15.75 16 0.25 0.25     ok
XIV NP 16 18.5 2.5 0.75     -1.75
XII–XIV N       4.5 3     -1.5
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2.25
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4.25
VII+VIII+XV+XVI RS         8 5.5 4 -4.25
IX–XI FS       3.75   2.5 4  
  S       4 9.5 7 5.5 -5.5
XVIIa ECh1 18.5 24 5.5 5 it.     -2
XVIIb ECh2 na     ms
XVIIc TXT   na     ok
XVIId PRG   na     ok
XVII ECh       5.5 1.5     -4
XVIIIa EML1   na     ok
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       9 7.75 6.75 6.25 -1.25
I SL 24 7 6 5.5
 
Relapse Recovery Day MCh 4 -2
5.25 6.75 7.25 9.5
6.75 7.25 -18 -5 -1