D   a   y       L   o   g
Friday 12. marca 2004
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 0.5 10.5 10 7 6 5.5 -3
II EX 47   0.75     ms
III MCh 48 10.5 15.5 5 1.25     -3.75
II–III M       5 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI PS         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1     ms
IX FP         2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 49 15.5 19.5 4 2     -2
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       4 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2         4 2.75 2 -4
XVI S3           1.5 3  
VII+VIII+XV LS         8 5.5 4 -8
VII+VIII+XV+XVI RS         8 5.5 4 -8
IX–XI FS           2.5 4  
  S         9.5 7 5.5 -9.5
XVIIa ECh1 19.5 22 2.5 na    
XVIIb ECh2 na    
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       2.5 1.5     -1
XVIIIa EML1   na     ok
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       10 7.75 6.75 6.25 -2.25
I SL 22 7 6 5.5
 
in MCh -1
Rooms Cleanup; small Items Repair Chores -1
RemCon, BackP & hfns chores -1