D   a   y       L   o   g
Saturday 10. januára 2004
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -1.25 12 13.25 7 6 5.5 -6.25
II EX   0.75      
III MCh 47 12 22.75 10.75 1.25     -9.5
II–III M       10.75 2     -8.75
IV FL   0.25      
V PrM       0.25      
VI QU   0.5      
IV–VI PS         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1     ms
IX FP         2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 2     ms
XIII PrN       0.25      
XIV NP   0.75      
XII–XIV N         3     ms
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2         4 2.75 2 -4
XVI S3           1.5 3  
VII+VIII+XV LS         8 5.5 4 -8
VII+VIII+XV+XVI RS         8 5.5 4 -8
IX–XI FS           2.5 4  
  S         9.5 7 5.5 -9.5
XVIIa ECh1 na    
XVIIb ECh2 na    
XVIIc TXT   na     ok
XVIId PRG   na      
XVII ECh         1.5     NA
XVIIIa EML1   na     ok
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out         1.25 2.25 2.75 NA
XX JR   0.25      
XXI PrB        
I + XIV SLS       13.25 7.75 6.75 6.25 -5.5
I SL 22.75 7 6 5.5
 
mingled with everything else; post-August Trash-Dumping; Eyes hardly kept open througout the Day
1
-1