D   a   y       L   o   g
Saturday 5. júna 2004
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 47 -1.5 12.5 11.25 7 6 5.5 -4.25
II EX   0.75     ms
III MCh 1.25     ms
II–III M         2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI PS         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP   25.25 27.25 2   2.5 4 -2
X FA         2.5 4  
XI F         2.5 4  
XII NCh 2     ms
XIII PrN       0.25     ms
XIV NP 15.75 19 3.25 0.75     -2.5
XII–XIV N       3.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2         4 2.75 2 -4
XVI S3           1.5 3  
VII+VIII+XV LS         8 5.5 4 -8
VII+VIII+XV+XVI RS         8 5.5 4 -8
IX–XI FS       2   2.5 4 -2
  S       2 9.5 7 5.5 -7.5
XVIIa ECh1 5 it.     -4
XVIIb ECh2 na     ms
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh         1.5     1.5
XVIIIa EML1 48 12.5 15.75 3.25 na     ok
XVIIIb EML2 48 19 25.25 6.25 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       9.5 1.25 2.25 2.75 -8.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       14.5 7.75 6.75 6.25 -6.75
I SL 27.25 7 6 5.5
 
2.75 5.5 MCh 4 -4
mingled with Chores, even a Bit of LT & esp. Recovery from yesterday's psycho-shocks & exhaustion
-1 -1 -1