D   a   y       L   o   g
Monday 30. augusta 2004
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -0.75 8 8.75 7 6 5.5 -1.75
II EX   0.75     ms
III MCh 8 9 1 1.25     0.25
II–III M       1 2     NA
IV FL   0.25     ms
V PrM   15.25 16 0.75 0.25     -0.5
VI QU   0.5     ms
IV–VI US       0.75 1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA   13.25 15.25 2   2.5 4 -2
XI F   9 13.25 4.25   2.5 4 -0.25
XII NCh 16 18 2 2     ok
XIII PrN   18 18.25 0.25 0.25     ok
XIV NP   0.75     ms
XII–XIV N       2.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       6.25   2.5 4 -2.25
  S       3 9.5 7 5.5 -6.5
XVIIa ECh1 18.25 22 3.75 5 it.     -4
XVIIb ECh2 na     ms
XVIIc TXT   na     ok
XVIId PRG   na     ok
XVII ECh       3.75 1.5     -2.25
XVIIIa EML1   na     ok
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       8.75 7.75 6.75 6.25 -1
I SL 22 7 6 5.5
 
MCh 4 -2
-27 -1 -1