D   a   y       L   o   g
Friday 11. júna 2004
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 1.5 6 4.5 7 6 5.5 2.5
II EX   0.75     ms
III MCh 47 6 7.5 1 1.25     0.25
II–III M       1 2     1
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI PS         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 48 6.5 18 4.75   2.5 4 -4.75
X FA   7.5 9 1.5   2.5 4 -1.5
XI F   9 11.75 2.75   2.5 4 -2.75
XII NCh 11.75 13.5 1.75 2     0.25
XIII PrN       0.25     ms
XIV NP 13.75 14 0.25 0.75     0.5
XII–XIV N       2 3     NA
XV S2b 22.25 22.5 0.25 3 2.75 2 -1.75
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       0.25 4 2.75 2 -1.75
XVI S3           1.5 3  
VII+VIII+XV LS       0.25 8 5.5 4 -4
VII+VIII+XV+XVI RS       0.25 8 5.5 4 -4
IX–XI FS       9   2.5 4 -5
  S       6.5 9.5 7 5.5 -3
XVIIa ECh1 19 20 1 5 it.     -4
XVIIb ECh2 22 22.25 0.25 na     ms
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       1.25 1.5     0.25
XVIIIa EML1 18 19 1 na     ok
XVIIIb EML2 20 22 2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       3 1.25 2.25 2.75 -1.75
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       4.75 7.75 6.75 6.25 3
I SL 22.5 7 6 5.5
 
6.5 7 MCh 4 -4
7 13.5 13.75 14
-1 -1 -1