D   a   y       L   o   g
Friday 30. januára 2004
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 3.25 8 4.75 7 6 5.5 2.25
II EX   0.75     ms
III MCh 8 8.5 0.5 1.25     0.75
II–III M       0.5 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI PS         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1     ms
IX FP         2.5 4  
X FA         2.5 4  
XI F   8.5 11.75 3.25   2.5 4  
XII NCh 47 11.75 15.25 3.5 2     -1.5
XIII PrN       0.25     ms
XIV NP 15.25 16.5 1.25 0.75     -0.5
XII–XIV N       4.75 3     NA
XV S2b 3 2.75 2 3
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV LS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       3.25   2.5 4  
  S         9.5 7 5.5 -9.5
XVIIa ECh1 47 16.5 27.5 11 na    
XVIIb ECh2 na    
XVIIc TXT   na     ms
XVIId PRG   na     ms
XVII ECh       11 1.5     -9.5
XVIIIa EML1   na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out         1.25 2.25 2.75 NA
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       6 7.75 6.75 6.25 1.75
I SL 27.5 7 6 5.5
 
New Tool Setup Chores
7
1