D   a   y       L   o   g
Friday 6. februára 2004
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -0.25 8 8.25 7 6 5.5 -1.25
II EX   0.75     ms
III MCh 8 8.75 0.75 1.25     0.5
II–III M       0.75 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI PS         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1     ms
IX FP         2.5 4  
X FA         2.5 4  
XI F   8.75 11.75 3   2.5 4  
XII NCh 47 11.75 19.5 7.75 2     -5.75
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       7.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV LS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       3   2.5 4  
  S         9.5 7 5.5 -9.5
XVIIa ECh1 19 22.75 3.75 na    
XVIIb ECh2 na    
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       3.75 1.5     -2.25
XVIIIa EML1   na     ok
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out         1.25 2.25 2.75 NA
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       8.25 7.75 6.75 6.25 -0.5
I SL 22.75 7 6 5.5
 
Marek Scrap while setting up 3 Staffroom machines; but they're up and running!
-1
-1