D   a   y       L   o   g
Tuesday 1. júna 2004
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -1.5 8.25 9.75 7 6 5.5 -2.75
II EX 8.25 9.75 1.5 0.75     -0.75
III MCh 9.75 10.5 0.75 1.25     0.5
II–III M       2.25 2     -0.25
IV FL   0.25     ms
V PrM   14.5 14.75 0.25 0.25     ok
VI QU   0.5     ms
IV–VI PS       0.25 1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA         2.5 4  
XI F 47 14.75 18 2.25   2.5 4  
XII NCh 48 10.5 17 5 2     -3
XIII PrN   19 19.25 0.25 0.25     ok
XIV NP   0.75     ms
XII–XIV N       5.25 3     -2.25
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV LS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       2.25   2.5 4  
  S       0.75 9.5 7 5.5 -8.75
XVIIa ECh1 18 19 1 5 it.     -4
XVIIb ECh2 19.25 19.5 0.25 na     ms
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       1.25 1.5     0.25
XVIIIa EML1 49 19.75 22.75 3 na     ok
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       3 1.25 2.25 2.75 -1.75
XX JR   0.25     ms
XXI PrB   19.5 19.75 0.25 ok
I + XIV SLS       9.75 7.75 6.75 6.25 -2
I SL 22.75 7 6 5.5
 
16 17 MCh 4 ok
14.5 16
mingled with ECh2 & AL (eg. quarreling with I, that is…) -1 -1 -1