D   a   y       L   o   g
Friday 24. septembra 2004
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -2 9.25 11.25 7 6 5.5 -4.25
II EX 9.25 10 0.75 0.75     ok
III MCh 10 11.25 1.25 1.25     ok
II–III M       2 2     ok
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA         2.5 4  
XI F   11.25 12.75 1.5   2.5 4  
XII NCh 47 12.75 18 5.25 2     -3.25
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       5.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3 21 21.75 0.75   1.5 3
VII S1         4 2.75 2 -3.5
VIII + XV S2         4 2.75 2 -3.75
XVI S3       0.75   1.5 3  
VII+VIII+XV PS         8 5.5 4 -7.25
VII+VIII+XV+XVI RS       0.75 8 5.5 4 -7.25
IX–XI FS       1.5   2.5 4  
  S       1 9.5 7 5.5 -8.5
XVIIa ECh1 18 21 3 5 it.     -4
XVIIb ECh2 na     ms
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       3 1.5     -1.5
XVIIIa EML1   na     ok
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR 21.75 21.75   0.25     ok
XXI PrB   21.75 22 0.25 ok
I + XIV SLS       11.25 7.75 6.75 6.25 -3.5
I SL 22 7 6 5.5
 
mixed with AL MCh 4 ok
-24 -5 -1