D   a   y       L   o   g
Monday 7. februára 2005
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 1 8 7 7 6 5.5 ok
II EX   0.75     ms
III MCh 49 8 11.75 2.75 1.25     -1.5
II–III M       2.75 2     NA
IV FL   0.25     ms
V PrM   9.25 9.5 0.25 0.25     ok
VI QU   0.5     ms
IV–VI US       0.25 1     NA
VII S1 4 2.75 2 ms
VIII S2a 10.25 11 0.75 1    
IX FP 48 19 25.5 5.5   2.5 4 -3.75
X FA         2.5 4  
XI F 47 12.25 15.75 2.25   2.5 4  
XII NCh 13.5 14.75 1.25 2     0.75
XIII PrN       0.25     ms
XIV NP 19.25 19.75 0.5 0.75     0.25
XII–XIV N       1.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       0.75 4 2.75 2 -1.25
XVI S3           1.5 3  
VII+VIII+XV PS       0.75 8 5.5 4 -3.25
VII+VIII+XV+XVI RS       0.75 8 5.5 4 -3.25
IX–XI FS       7.75   2.5 4 -3.75
  S       6.5 9.5 7 5.5 -3
XVIIa ECh1 16.25 19 2.75 5 it.     -4
XVIIb ECh2 19.75 20 0.25 na     ms
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       3 1.5     -1.5
XVIIIa EML1 11.75 12.25 0.5 na     ok
XVIIIb EML2 15.75 16.25 0.5 na    
XIX AL 20 20.25 0.25 1.25 2.25 2.75 1
XVIII–XIX Out       1.25 1.25 2.25 2.75 ok
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       7.5 7.75 6.75 6.25 0.25
I SL 25.5 7 6 5.5
 
13.5 14.75 MCh 4 ok
19.25 20.25
9.25 9.5 10.25 11 -7 -1 -1