D   a   y       L   o   g
Thursday 5. februára 2004
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 0.5 4.75 4.25 7 6 5.5 2.75
II EX   0.75     ms
III MCh 48 9 9.5 0.5 1.25     0.75
II–III M       0.5 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI PS         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1     ms
IX FP   4.75 7.5 2.75   2.5 4 -2.75
X FA         2.5 4  
XI F 47 7.5 20 6.5   2.5 4 -2.5
XII NCh 49 12.5 18 5.5 2     -3.5
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       5.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV LS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       9.25   2.5 4 -5.25
  S       2.75 9.5 7 5.5 -6.75
XVIIa ECh1 20 23.75 3.75 na    
XVIIb ECh2 na    
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       3.75 1.5     -2.25
XVIIIa EML1   na     ok
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out         1.25 2.25 2.75 NA
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       4.25 7.75 6.75 6.25 3.5
I SL 23.75 7 6 5.5
 
9 9.5 12.5 18 1
and mingled with the Morning's FP
Continuation of Staffroom Machines Setup along with Marek; *first* Time Net running -1