D   a   y       L   o   g
D   a   y       L   o   g
Thursday 17. júla 2008
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -2 6.75 8.75 7 6 5.5 -1.75
II EX tn+ 6.75 7.5 0.75 0.75     ok
IIIa MCh 8 10.5 2.5 1.25     -1.25
IIIb MCh PF 100%     4 it. Wght 95.1 ok
II–III M       3.25 2     -1.25
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP   11.75 14.5 2.75  
X FA        
XI F   7.5 8 0.5  
XII NCh 14.75 18.5 3.75 2     -1.75
XIII PrN       0.25     ms
XIV NP 51 11 19.25 1.5 0.75     -0.75
XII–XIV N       5.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       3.25 0 2.5 4  
  S       2.75 9.5 9.5 9.5 -6.75
XVIIa ECh1 19.25 23 3.75 5 it.     -3
XVIIb ECh2 5.5     10.75
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       3.75 1.5     -2.25
XVIIIa EML1 10.5 11 0.5 na     ms
XVIIIb EML2 14.5 14.75 0.25 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       0.75 1.25 2.25 2.75 0.5
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       10.25 7.75 6.75 6.25 -2.5
I SL 23 7 6 5.5
     
WLS in: 60% out: 60% in: 75% out: 75%
Walks ok ms CleanUps ms ms -12 -2 -1
11.75 18.5