D   a   y       L   o   g
D   a   y       L   o   g
Monday 14. júla 2008
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -1.5 8.25 9.75 7 6 5.5 -2.75
II EX 8.25 9 0.75 0.75     ok
IIIa MCh 51 9 11 2 1.25     -0.75
IIIb MCh PF 100% 100%   4 it. Wght 96.4 ok
II–III M       2.75 2     -0.75
IV FL 11 11.25 0.25 0.25     ok
V PrM   11.25 11.5 0.25 0.25     ok
VI QU 13 13.5 0.5 0.5     ok
IV–VI US       1 1     ok
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD   13.5 14 0.5 0 2.5 4  
IXb FP 52 11.5 19 2.25  
X FA        
XI F        
XII NCh 53 14 17.75 3.25 2     -1.25
XIII PrN   19 19.25 0.25 0.25     ok
XIV NP 19.25 19.75 0.5 0.75     0.25
XII–XIV N       4 3     -1
XV S2b 22.25 22.75 0.5 3 2.75 2 -2.5
XVI S3   1.5 3
VII S1         4 2.75 2 -2.75
VIII + XV S2       0.5 4 2.75 2 -2.25
XVI S3           1.5 3  
VII+VIII+XV PS       0.5 8 5.5 4 -5
VII+VIII+XV+XVI RS       0.5 8 5.5 4 -5
IX–XI FS       2.75 0 2.5 4  
  S       4 9.5 9.5 9.5 -5.5
XVIIa ECh1 19.75 22.25 2.5 5 it.     -2
XVIIb ECh2 5.5     8.5
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       2.5 1.5     -1
XVIIIa EML1 12 13 1 na     ok
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       1 1.25 2.25 2.75 0.25
XX JR 22.75 22.75   0.25     ok
XXI PrB       ms
I + XIV SLS       10.25 7.75 6.75 6.25 -2.5
I SL 22.75 7 6 5.5
     
WLS in: 50% out: 5% in: 80% out: 20%
Walks ok ok CleanUps ok ok -11 -1 -1
  incl. 0.5 DN, LT
12 14.5 15 17.75
14.5 15