D   a   y       L   o   g
D   a   y       L   o   g
Wednesday 2. júla 2008
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 2 7.25 5.25 7 6 5.5 1.75
II EX   0.75     ms
IIIa MCh 51 7.25 12.25 1.25 1.25     ok
IIIb MCh PF       4 it. Wght 99.3 -1
II–III M       1.25 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD   9.75 10.25 0.5 0 2.5 4  
IXb FP   8 9.75 1.75  
X FA        
XI F        
XII NCh 12.25 15.5 3.25 2     -1.25
XIII PrN       0.25     ms
XIV NP 52 10.25 16.5 2.5 0.75     -1.75
XII–XIV N       5.75 3     NA
XV S2b 16.5 18.5 2 3 2.75 2
XVI S3 18.5 20.25 1.75   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       2 4 2.75 2  
XVI S3       1.75   1.5 3  
VII+VIII+XV PS       2 8 5.5 4 -2
VII+VIII+XV+XVI RS       3.75 8 5.5 4 -0.25
IX–XI FS       2.25 0 2.5 4  
  S       5.5 9.5 9.5 9.5 -4
XVIIa ECh1 20.25 23.5 3.25 5 it.     -2
XVIIb ECh2 5.5     7.75
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       3.25 1.5     -1.75
XVIIIa EML1   na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       7.75 7.75 6.75 6.25  
I SL 23.5 7 6 5.5
     
WLS in: 10% out: 90% in: 25% out: 15%
Walks ok ok CleanUps ok ms -2 -3 -1
8 11.75 incl. DN, LT
11.75 15.5