w
D   a   y       L   o   g
Tuesday 27. mája 2008
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -1.25 9 10.25 7 6 5.5 -3.25
II EX psu 9 9.75 0.75 0.75     ok
IIIa MCh 9.75 11.75 2 1.25     -0.75
IIIb MCh PF 100% 100%   4 it. Wght 100.2 -1
II–III M       2.75 2     -0.75
IV FL 15.75 16 0.25 0.25     ok
V PrM   15.5 15.75 0.25 0.25     ok
VI QU 16 16.5 0.5 0.5     ok
IV–VI US       1 1     ok
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD   14.75 15 0.25 0 2.5 4  
IXb FP 51 11.75 19.25 2.75  
X FA        
XI F        
XII NCh 52 12.25 15.5 2.5 2     -0.5
XIII PrN   16.5 16.75 0.25 0.25     ok
XIV NP 16.75 17.5 0.75 0.75     ok
XII–XIV N       3.5 3     -0.5
XV S2b 21.25 23.75 2.5 3 2.75 2
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       2.5 4 2.75 2  
XVI S3           1.5 3  
VII+VIII+XV PS       2.5 8 5.5 4 -1.5
VII+VIII+XV+XVI RS       2.5 8 5.5 4 -1.5
IX–XI FS       3 0 2.5 4  
  S       6.5 9.5 9.5 9.5 -3
XVIIa ECh1 19.25 21.25 2 5 it.     ok
XVIIb ECh2 5.5     7.25
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       2 1.5     -0.5
XVIIIa EML1   na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       11 7.75 6.75 6.25 -3.25
I SL 23.75 7 6 5.5
     
WLS in: 20% out: 80% in: 80% out: 60%
Walks ok ok CleanUps ok ms -7 -2 -1
12.25 14.25 14.75 17.5
14.25 15