w
D   a   y       L   o   g
Friday 2. mája 2008
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -0.5 6 6.5 7 6 5.5 0.5
II EX   0.75     ms
IIIa MCh 6 7 1 1.25     ms
IIIb MCh PF       4 it. Wght 101.3 -3
II–III M       1 2     1
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP   9.5 16 6.5 -2.5
X FA        
XI F        
XII NCh 16 24.5 8.5 2     -6.5
XIII PrN       0.25     ms
XIV NP 7 8 1 0.75     -0.25
XII–XIV N       9.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3 24.5 26 1.5   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       1.5   1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       1.5 8 5.5 4 -2.5
IX–XI FS       6.5 0 2.5 4 -2.5
  S       8 9.5 9.5 9.5 -1.5
XVIIa ECh1 5 it.     -3
XVIIb ECh2 5.5     9.5
XVIIc TXT   na     ms
XVIId PRG   na     ms
XVII ECh         1.5     NA
XVIIIa EML1 8 9.5 1.5 na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       1.5 1.25 2.25 2.75 -0.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       7.5 7.75 6.75 6.25 0.25
I SL 26 7 6 5.5
     
WLS in: 50% out: 50% in: 20% out: 20%
Walks ms ok CleanUps ms ms 1 1
  Opacha Arrival