D   a   y       L   o   g
D   a   y       L   o   g
Friday 9. februára 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -2 5.5 7.5 7 6 5.5 -0.5
II EX   0.75     ms
IIIa MCh 5.5 6.75 1.25 1.25     ok
IIIb MCh PF       4 it. Wght  
II–III M       1.25 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP 51 6.75 17 7 -3
X FA        
XI F        
XII NCh 53 14.5 18.75 3.75 2     -1.75
XIII PrN       0.25     ms
XIV NP 52 7.25 19.25 1.25 0.75     -0.5
XII–XIV N       5 3     NA
XV S2b 21.75 22.25 0.5 3 2.75 2 -1.5
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       0.5 4 2.75 2 -1.5
XVI S3           1.5 3  
VII+VIII+XV PS       0.5 8 5.5 4 -3.5
VII+VIII+XV+XVI RS       0.5 8 5.5 4 -3.5
IX–XI FS       7 0 2.5 4 -3
  S       7.75 9.5 9.5 9.5 -1.75
XVIIa ECh1 19.25 21.75 2.5 5 it.    
XVIIb ECh2 5.5     7.5
XVIIc TXT   na     ok
XVIId PRG   na    
XVII ECh       2.5 1.5     -1
XVIIIa EML1 14 14.5 0.5 na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       0.5 1.25 2.25 2.75 0.75
XX JR 22.5 22.5   0.25     ok
XXI PrB   22.25 22.5 0.25 ok
I + XIV SLS       8.75 7.75 6.75 6.25 -1
I SL 22.5 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -6 -2 -1
7.25 8 14 16.5
8 18.75
16.5 17