D   a   y       L   o   g
D   a   y       L   o   g
Thursday 21. decembra 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 1.75 7.25 5.5 7 6 5.5 1.5
II EX   0.75     ms
III MCh 47 7.25 11 3.75 1.25     -2.5
II–III M       3.75 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 47 11 22 8.75   2.5 4 -4.75
X FA         2.5 4  
XI F         2.5 4  
XII NCh 48 15 18 2.25 2     -0.25
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       2.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3 24 30.75 6.75   1.5 3 -3.75
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       6.75   1.5 3 -3.75
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       6.75 8 5.5 4 2.75
IX–XI FS       8.75   2.5 4 -4.75
  S       15.5 9.5 7 5.5 6
XVIIa ECh1 22 24 2 5 it.    
XVIIb ECh2 na    
XVIIc TXT   na     ok
XVIId PRG   na    
XVII ECh       2 1.5     -0.5
XVIIIa EML1   na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       5.5 7.75 6.75 6.25 2.25
I SL 30.75 7 6 5.5
 
incl. LT, DN 15 16.25 17 18 MCh 4
16.25 17 1st Part = incl. LT 8
-1