D   a   y       L   o   g
Friday 22. septembra 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -2.5 7.5 10 7 6 5.5 -3
II EX   0.75     ms
III MCh 7.5 8.5 1 1.25     0.25
II–III M       1 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 48 9.25 18.5 5.75   2.5 4 -1.75
X FA         2.5 4  
XI F         2.5 4  
XII NCh 12 13.75 1.75 2     0.25
XIII PrN       0.25    
XIV NP   0.75     ms
XII–XIV N       1.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       5.75   2.5 4 -1.75
  S       5.75 9.5 7 5.5 -3.75
XVIIa ECh1 20.5 21.75 1.25 5 it.    
XVIIb ECh2 na    
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       1.25 1.5     0.25
XVIIIa EML1 47 8.5 15.5 2.5 na    
XVIIIb EML2 18.5 20.5 2 na    
XIX AL 21.75 22.25 0.5 1.25 2.25 2.75 0.75
XVIII–XIX Out       5 1.25 2.25 2.75 -3.75
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       10 7.75 6.75 6.25 -2.25
I SL 22.25 7 6 5.5
 
9.25 13.75 MCh 4
12 15.5 4
-1