D   a   y       L   o   g
Thursday 29. júna 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -1 2.5 3.5 7 6 5.5 3.5
II EX   0.75     ms
III MCh 47 2.5 8.5 4.5 1.25     -3.25
II–III M       4.5 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP   8.5 10.75 2.25   2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 48 10.75 16.25 4 2     -2
XIII PrN       0.25    
XIV NP F 6 18.75 5.5 0.75     -4.75
XII–XIV N       9.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2.75
VIII + XV S2         4 2.75 2 -2.75
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -5.5
VII+VIII+XV+XVI RS         8 5.5 4 -5.5
IX–XI FS       2.25   2.5 4  
  S       2.25 9.5 7 5.5 -7.25
XVIIa ECh1 18.75 22.5 3.75 5 it.    
XVIIb ECh2 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       3.75 1.5     -2.25
XVIIIa EML1   na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       9 7.75 6.75 6.25 -1.25
I SL 22.5 7 6 5.5
 
6 7.5 1st Part = DN, LT MCh 4
14.5 16 12.25
7.5 14.5 16 16.25 -1