D   a   y       L   o   g
Friday 23. júna 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 1.75 6.5 4.75 7 6 5.5 2.25
II EX   0.75     ms
III MCh 47 6.5 6.75 0.25 1.25     1
II–III M       0.25 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 47 7 12.75 4.75   2.5 4 -0.75
X FA         2.5 4  
XI F 48 15 18 2.75   2.5 4 -2.75
XII NCh 12.75 15 2.25 2     -0.25
XIII PrN       0.25    
XIV NP F 9 17.25 1.25 0.75     -0.5
XII–XIV N       3.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       7.5   2.5 4 -3.5
  S       4.75 9.5 7 5.5 -4.75
XVIIa ECh1 18 21.5 3.5 5 it.    
XVIIb ECh2 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       3.5 1.5     -2
XVIIIa EML1 6.75 7 0.25 na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       0.25 1.25 2.25 2.75 1
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       6 7.75 6.75 6.25 1.75
I SL 21.5 7 6 5.5
 
incl. a Bit of LT 9 10 MCh 4
17 17.25 6
10 17 -1