D   a   y       L   o   g
Thursday 22. júna 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -2 7.75 9.75 7 6 5.5 -2.75
II EX   0.75     ms
III MCh 7.75 8.25 0.5 1.25     0.75
II–III M       0.5 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 48 9.25 19.75 8.25   2.5 4 -4.25
X FA         2.5 4  
XI F         2.5 4  
XII NCh 13 14.75 1.75 2     0.25
XIII PrN       0.25    
XIV NP   0.75     ms
XII–XIV N       1.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       8.25   2.5 4 -4.25
  S       8.25 9.5 7 5.5 -1.25
XVIIa ECh1 49 20 25.75 5.75 5 it.    
XVIIb ECh2 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       5.75 1.5     -4.25
XVIIIa EML1 47 8.25 13 1.5 na    
XVIIIb EML2 19.75 20 0.25 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       1.75 1.25 2.25 2.75 -0.5
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       9.75 7.75 6.75 6.25 -2
I SL 25.75 7 6 5.5
 
9.25 12.5 MCh 4
12.5 14.75 8
incl. massive LT, DN... -1