D   a   y       L   o   g
Sunday 11. júna 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -3 3 6 7 6 5.5 1
II EX   0.75     ms
III MCh 47 3 7.25 4.25 1.25     -3
II–III M       4.25 2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP         2.5 4  
X FA         2.5 4  
XI F   7.25 12.25 5   2.5 4 -1
XII NCh 12.25 15.75 3.5 2     -1.5
XIII PrN       0.25    
XIV NP 15.75 17.5 1.75 0.75     -1
XII–XIV N       5.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3 17.5 20 2.5   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       2.5   1.5 3 0.5
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       2.5 8 5.5 4 -1.5
IX–XI FS       5   2.5 4 -1
  S       2.5 9.5 7 5.5 -7
XVIIa ECh1 22.5 26.25 3.75 5 it.    
XVIIb ECh2 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       3.75 1.5     -2.25
XVIIIa EML1 20 22.5 2.5 na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       2.5 1.25 2.25 2.75 -1.25
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       7.75 7.75 6.75 6.25  
I SL 26.25 7 6 5.5
 
incl. DN MCh 4
11.5
Newman Finish 1