D   a   y       L   o   g
Friday 2. júna 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -0.25 7.5 7.75 7 6 5.5 -0.75
II EX 14.25 15 0.75 0.75     ok
III MCh 47 7.5 14.25 5 1.25     -3.75
II–III M       5.75 2     -3.75
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP   16 17.25 1.25   2.5 4  
X FA         2.5 4  
XI F   17.25 18 0.75   2.5 4  
XII NCh 15 16 1 2     1
XIII PrN       0.25    
XIV NP F 8.75 10.25 1.5 0.75     -0.75
XII–XIV N       2.5 3     NA
XV S2b 8.5 8.75 0.25 3 2.75 2 -2.5
XVI S3   1.5 3
VII S1         4 2.75 2 -2.75
VIII + XV S2       0.25 4 2.75 2 -2.5
XVI S3           1.5 3  
VII+VIII+XV PS       0.25 8 5.5 4 -5.25
VII+VIII+XV+XVI RS       0.25 8 5.5 4 -5.25
IX–XI FS       2   2.5 4  
  S       1.5 9.5 7 5.5 -8
XVIIa ECh1 18 22.5 4.5 5 it.    
XVIIb ECh2 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       4.5 1.5     -3
XVIIIa EML1   na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       9.25 7.75 6.75 6.25 -1.5
I SL 22.5 7 6 5.5
 
8.5 10.25 MCh 4
11.25
-1