D   a   y       L   o   g
Sunday 19. marca 2006
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 1.5 8.5 7 7 6 5.5 ok
II EX   0.75     ms
III MCh 1.25     ms
II–III M         2     NA
IV FL   0.25    
V PrM       0.25    
VI QU   0.5    
IV–VI US         1     NA
VII S1 47 8.5 20.5 11.5 4 2.75 2 7.5
VIII S2a 1    
IX FP         2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 2     ms
XIII PrN       0.25    
XIV NP 10 10.5 0.5 0.75     0.25
XII–XIV N       0.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1       11.5 4 2.75 2 7.5
VIII + XV S2         4 2.75 2 -4
XVI S3           1.5 3  
VII+VIII+XV PS       11.5 8 5.5 4 3.5
VII+VIII+XV+XVI RS       11.5 8 5.5 4 3.5
IX–XI FS           2.5 4  
  S       11.5 9.5 7 5.5 2
XVIIa ECh1 20.5 26 5.5 5 it.    
XVIIb ECh2 na     ms
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       5.5 1.5     -4
XVIIIa EML1   na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB      
I + XIV SLS       7.5 7.75 6.75 6.25 0.25
I SL 26 7 6 5.5
 
10 10.5 MCh 4
5.5
-1